*** SYSTEM INITIALIZING ***

BOOTING MAIN OS... [E-OS v2.12.5]

MAIN OS CHECK... [GOOD]

THE DATE IS: JAN 1, 1970

THE TIME IS: 00:00

RUN> AUTOCHK

*** AUTOCHECK STARTING ***

[...]

[...]

[...]

[...]

[...]

*** AUTOCHECK COMPLETE ***

--- RESULTS ---

POWER: REACTOR FUNCTIONAL

CRYOBAY: 11 NON-FUNCTIONAL, 1 FUNCTIONAL

MAIN ENGINES: OPERATING AT 66.5% CAPACITY

NAVIGATION: NON-FUNCTIONAL

THERMAL CONTROLS: OPERATING AT 70% CAPACITY

COMPUTER SYSTEMS: FAULT IN SECTION A3, OTHERWISE FUNCTIONAL

LIFE SUPPORT: OPERATING AT 96% CAPACITY

HULL: NO BREACHES, INTEGRITY AT 98%

COMMUNICATIONS: FULLY FUNCTIONAL, RELAY DETECTED

*** ATTEMPTING CONNECTION TO QEC RELAY ***

[...]

[...]

[...]

*** CONNECTION SUCCESSFUL ***

*** BEGIN WAKE-UP FOR G. SIMMONS ***


Source