neil in gemini space
alpha pv frame - 2022-10-26
i built the frame around the pv panels (resting on 100 mm insulation board to protect the panel).
- 38 x 63 CLS treated.
- a mix of screws - i will replace these now that i have appropriate wx resistant screws. 100 mm for the main frame joints, pre-drilled to avoid splitting the CLS.
- frame held down with concrete gravel boards (6") and an old door lintel (like really heavy lol).
the gale two nights ago stripped bits off the half-finished roof: my pv frame stayed where i left it:-) was a worry however!
2022-10-16 - (119K) pv kit pallet.
2022-10-18 - (80K) alpha frame built around pv panels.
- 2022-10-22 - (117K) alpha frame build.
- 2022-10-22 - (85K) alpha frame built and weighted down.
so with my first frame attempt built i iterated and started the beta frame.
---
return to gemini.mingmengtou.org index page.
---
neil.gemini@mingmengtou.org
content licensed CC-BY-SA 4.0 unless stated.
Source